Deskripsyon
The sidewalk on the East side of North Ave from the exit to Hunt Middle school going south towards downtown is disintegrating. Has it been scheduled to be replaced? During the winter, it fills with ice and is sometimes impassable.
ay nagtanong din...
T. Problem with sidewalks:
S. Cracked/broken/ heaved surface
S. Cracked/broken/ heaved surface
7 Komentos
IT Department (Beripikadong Opisiyal)
Kinilala SCormier (Beripikadong Opisiyal)
Isinara SCormier (Beripikadong Opisiyal)
Reopened Burlingtonian (Rehistradong User)
Kinilala SCormier (Beripikadong Opisiyal)
SCormier (Beripikadong Opisiyal)
Isinara DPW Engineering LW (Beripikadong Opisiyal)
Work Completed 2021
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.