Descrizione
The sidewalk on the East side of North Ave from the exit to Hunt Middle school going south towards downtown is disintegrating. Has it been scheduled to be replaced? During the winter, it fills with ice and is sometimes impassable.
ha chiesto inoltre...
D. Problem with sidewalks:
R. Cracked/broken/ heaved surface
R. Cracked/broken/ heaved surface
7 Commentos
IT Department (Ufficialità verificata)
Riconosciuto SCormier (Ufficialità verificata)
Chiusa SCormier (Ufficialità verificata)
Reopened Burlingtonian (Utente registrato)
Riconosciuto SCormier (Ufficialità verificata)
SCormier (Ufficialità verificata)
Chiusa DPW Engineering LW (Ufficialità verificata)
Work Completed 2021
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.