الوصف
The sidewalk on the East side of North Ave from the exit to Hunt Middle school going south towards downtown is disintegrating. Has it been scheduled to be replaced? During the winter, it fills with ice and is sometimes impassable.
سئل أيضا...
Q. Problem with sidewalks:
A. Cracked/broken/ heaved surface
A. Cracked/broken/ heaved surface
7 تعليقs
IT Department (تم التحقق رسميا)
تم إقراره SCormier (تم التحقق رسميا)
مغلق SCormier (تم التحقق رسميا)
فتح Burlingtonian (مستخدم مسجل)
تم إقراره SCormier (تم التحقق رسميا)
SCormier (تم التحقق رسميا)
مغلق DPW Engineering LW (تم التحقق رسميا)
Work Completed 2021
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.