Descrição
The sidewalk on the East side of North Ave from the exit to Hunt Middle school going south towards downtown is disintegrating. Has it been scheduled to be replaced? During the winter, it fills with ice and is sometimes impassable.
também perguntou...
Q. Problem with sidewalks:
A. Cracked/broken/ heaved surface
A. Cracked/broken/ heaved surface
7 Comentários
IT Department (Oficial Verificado)
Reconhecida SCormier (Oficial Verificado)
Encerradas SCormier (Oficial Verificado)
Reaberta Burlingtonian (Utilizador Registado)
Reconhecida SCormier (Oficial Verificado)
SCormier (Oficial Verificado)
Encerradas DPW Engineering LW (Oficial Verificado)
Work Completed 2021
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.