الوصف
PG&E recently repaved and re-striped 4th Street as part of a utility project, but the crosswalks at 4th and Clay were not installed with high viz continental striping per Oakland’s current standard. The red curb on the near side of the crosswalks does not appear to be long enough for adequate sight lines either.
Please follow up with PG&E to ensure that Oakland’s current design standards are being applied here and with all of the other streets and intersections they are currently working on throughout the Jack London Square area.
سئل أيضا...
A. OK
A. This is not one of the issues listed here.
2 تعليقs
تم إقراره City of Oakland (تم التحقق رسميا)
Kaylee (مستخدم مسجل)