Is there any update on this? It's impossible for this single mom to push the stroller and walk the dog. The cars come too fast around the blind curve to cross the street!
Area video inspected 6/26. Repairs will involve the removal and replacement of the pipe running under the sidewalk. Sidewalk is severely undermined at this location. As such, the sidewalk must remain closed until repairs are completed and the area made safe. Area is properly closed off and signs are posted. Advise pedestrians to use the other side of the road where possible; apologies for the inconvenience.
Contractor work complete 8/22/18. Failed metal pipe replaced with HDPE. Area restored, sidewalk replaced. Reported soil settlement repaired before Contractor demobilized. Mayfield shop to monitor for any further soil settlement.
13 تعليقs
DPW HWYS Office (تم التحقق رسميا)
DPW HWYS Amy Rill (تم التحقق رسميا)
W French (مستخدم مسجل)
Jdanna (مستخدم مسجل)
Nicholas Vogelsang (مستخدم مسجل)
تم إقراره DPW HWYS M. Wolf (تم التحقق رسميا)
DPW HWYS M. Wolf (تم التحقق رسميا)
DPW HWYS M. Wolf (تم التحقق رسميا)
DPW HWYS M. Wolf (تم التحقق رسميا)
Jdanna (مستخدم مسجل)
DPW HWYS M. Wolf (تم التحقق رسميا)
Jdanna (مستخدم مسجل)
مغلق DPW HWYS M. Wolf (تم التحقق رسميا)