Opis
Construction crew on the former bank on the northeast corner to turn it into a CVS have connected to the fire hydrant but the connection is not tight so water is running down the street. The storm drains along the way are blocked or clogged so it goes down to the storm drain in front of the fire station, the whole length of the block. This is not just a trickle so wasting lots of water.
5 Skomentujs
Cambridge Public Works (Verified Official)
City Hall – DR (Verified Official)
Potwierdzone Water - RH (Verified Official)
shepardsalzer@mac.com (Zarejestrowany użytkownik)
Zamknięte Water - RH (Verified Official)