Description
Construction crew on the former bank on the northeast corner to turn it into a CVS have connected to the fire hydrant but the connection is not tight so water is running down the street. The storm drains along the way are blocked or clogged so it goes down to the storm drain in front of the fire station, the whole length of the block. This is not just a trickle so wasting lots of water.
5 Comments
Cambridge Public Works (Verified Official)
City Hall – DR (Verified Official)
Acknowledged Water - RH (Verified Official)
shepardsalzer@mac.com (Registered User)
Closed Water - RH (Verified Official)