说明
Resident is requesting sign or delineators be put on Bergen Avenue at Kearney Avenue. She said it is hard to make a left hand turn from Kearney onto Bergen when the cars are parked near the corner.
还问了...
问 Please select the issue:
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
问 Additional Information
答 没有给出答案
答 没有给出答案
6 评论s
RRC <small class="fwn">(官方验证)</small>
已确认 Traffic – Jennifer C (官方验证)
RRC - Diane (官方验证)
RRC - Samantha (官方验证)
Engineering - Althea (官方验证)
Engineering - Althea (官方验证)