We have put in 8ft of under drain and digging the hole for the new inlet box.We have located the storm drain pipe and has cut the pipe and we currently excavating a little deeper to prepare for the inlet box floor.(I will be glad when this job is done.)Thanks.
Do to the water flow under the pipe .We had to bring in the vactor truck to vactor out the dirt that was underneath the pipe. It is a steady flow of water entering the hole that we excavated. Mr. Fugate contacted Utilities for another fluoride test and the results were negative. this is well water coming up to the service.
We have started installing the inlet box today. We currently used 250 Bricks, 5-bags of mortar. Chris D has the vactor truck on location removing the water out of the box as they lay bricks. He vactor about 500 gallons of water from the hole. Thanks.
We have finish the inlet box and we are currently waiting for the Miss utility stake out to clear before we start putting in the 4 inch underdrain pipe that will tie in to the inlet box. Thanks.
Thank you for contacting the Howard County DPW Bureau of Highways. This issue is now closed in Tell HoCo. If you require more information, please contact Department of Public Works Highways office 410-313-7450.
21 Comments
DPW HWYS Office (Verified Official)
DPW HWYS Amy Rill (Verified Official)
應答 DPW HWYS Jim Barker (Verified Official)
DPW HWYS M Shifflett (Verified Official)
DPW HWYS Amy Rill (Verified Official)
CSimmons (Registered User)
CSimmons (Registered User)
CSimmons (Registered User)
CSimmons (Registered User)
CSimmons (Registered User)
DPW HWYS Jimmy Mathis (Verified Official)
CSimmons (Registered User)
CSimmons (Registered User)
DPW HWYS Jimmy Mathis (Verified Official)
CSimmons (Registered User)
CSimmons (Registered User)
CSimmons (Registered User)
CSimmons (Registered User)
DPW HWYS Jim Barker (Verified Official)
關閉 DPW HWYS Jim Barker (Verified Official)
DPW HWYS Jim Barker (Verified Official)