Mô tả
I would like to request that a crosswalk and traffic calming measure be installed at this location.
cũng đã hỏi...
Hỏi. Select the issue
Đáp. Install Traffic Calming
Đáp. Install Traffic Calming
I would like to request that a crosswalk and traffic calming measure be installed at this location.
27 Bình luậns
Howard County, MD (Tell HoCo) (Chính thức đã xác nhận)
DPW HWYS Danny H (Chính thức đã xác nhận)
catty6 (Người dùng đã đăng ký)
Cedric (Người dùng đã đăng ký)
Được thừa nhận DPW Traffic Diane B (Chính thức đã xác nhận)
David Heiliger (Người dùng đã đăng ký)
DPW Traffic Diane B (Chính thức đã xác nhận)
David Heiliger (Người dùng đã đăng ký)
DPW Traffic Diane B (Chính thức đã xác nhận)
Julie (Người dùng đã đăng ký)
Alyson Precie (Người dùng đã đăng ký)
DPW Traffic Diane B (Chính thức đã xác nhận)
Kristal Burgess (Người dùng đã đăng ký)
DPW Traffic Diane B (Chính thức đã xác nhận)
David Heiliger (Người dùng đã đăng ký)
I reached out to HoCo police today at the number you provided. Here is the result of that phone exchange.
1. The non-emergency operator was not able to handle this issue so she gave me the number for the local duty officer department.
2. The local duty officer took a message and I got a return call within 2 hours from an officer that referred me to the traffic enforcement section of the police force.
3. After being transferred to that specific office I received a message that said they would not be back in the office until July 5.
4. I left a message with that office outlining your scheduling to send an engineer to do a traffic study and your advising us to report the speeding issue to the HoCo police for enforcement support.
Kevin Levi-Goerlich (Người dùng đã đăng ký)
Reggie (Người dùng đã đăng ký)
David Heiliger (Người dùng đã đăng ký)
Thanks for continuing to move this project along in the pipeline.
Could you give us an idea as to when the traffic study engineer might begin their evaluation?
David Heiliger (Người dùng đã đăng ký)
Could you update us with the latest developments?
David Heiliger (Người dùng đã đăng ký)
I just spoke with Officer Salato from the traffic enforcement section of the HoCo Police and he informed me that his department does not have the capacity to do a speed study in our neighborhood. He said that their caseload is such that it would be over a year before they could devote attention to this project. He advised us to continue to work with your there in the traffic engineering division to move this request forward.
We would love an update from your office to let us know of your progress on this matter.
Thank you
David Heiliger (Người dùng đã đăng ký)
1. He did a site visit and evaluated road curve, sight lines, road width, Columbia path location, ADA ramp placement among other things in relation to pedestrian crossing safety
2. He looked at the records from previous evaluations of traffic and speed in this area and saw that the data needs to be updated.
3. He will be looking into this project and should have a realistic timeline in place in about two weeks.
Thanks again!!
David Heiliger (Người dùng đã đăng ký)
DPW Traffic Y Zhang (Chính thức đã xác nhận)
DPW Traffic Y Zhang (Chính thức đã xác nhận)
A marked crosswalk with bump out on the southbound Tamar Drive near CA pathways is an ideal location for pedestrian and cyclists crossing. Pending on funding, the design and construction may start in FY24, after July 1st, 2023.
David Heiliger (Người dùng đã đăng ký)
As you consider the usage of this road I thought it might be important to know its use throughout the summer. Attached is a picture of the area when the pool is in use. This might affect bike lane plans.
DPW Traffic Y Zhang (Chính thức đã xác nhận)
DPW Traffic Y Zhang (Chính thức đã xác nhận)