Deskripsyon

Valley Road has been torn up for well over six weeks now as part of a reconstruction project. It should not take this long to tear up old pavement, regrade, install storm drains, and repave. The entire Russell Road project was done in half this time, and included major widening and rock removal. In addition, Valley Road runs through water company property and there are no erosion control measures installed. If the town doesn't get this done - and soon - I intend to send the First Selectman a bill for the damage done to the tires and suspension on my car.


12 Komentos

  • Bethany Resident 52 YEARS (Panauhin)

  • megan (Rehistradong User)

  • Bethany TAXPAYER (Panauhin)

  • SENIOR CITIZEN (Panauhin)

  • Bethany Old Timer (Panauhin)

  • Senior Citizen Too (Panauhin)

  • Bethany Old Timer (Panauhin)

  • Mary a proud Senior Citizen (Panauhin)

  • John (Panauhin)

  • Bethany Walker (Panauhin)

  • Isinara Jack (Rehistradong User)

  • Peck Road Walker (Panauhin)

Sarado ang komento para sa mga isyu na nasa artsibo.