This is an unaffiliated request

Never-ending Road Reconstruction تم حفظه في الأرشيف

تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

(ضيف)

ID قضية:

104440

Submitted To:

الجماعة

فئة:

لا يوجد

شاهدوا:

4797 مرات

حي:

Bethany

ذكرت:

في

الوصف

Valley Road has been torn up for well over six weeks now as part of a reconstruction project. It should not take this long to tear up old pavement, regrade, install storm drains, and repave. The entire Russell Road project was done in half this time, and included major widening and rock removal. In addition, Valley Road runs through water company property and there are no erosion control measures installed. If the town doesn't get this done - and soon - I intend to send the First Selectman a bill for the damage done to the tires and suspension on my car.


12 تعليقs

  • Bethany Resident 52 YEARS (ضيف)

  • megan (مستخدم مسجل)

  • Bethany TAXPAYER (ضيف)

  • SENIOR CITIZEN (ضيف)

  • Bethany Old Timer (ضيف)

  • Senior Citizen Too (ضيف)

  • Bethany Old Timer (ضيف)

  • Mary a proud Senior Citizen (ضيف)

  • John (ضيف)

  • Bethany Walker (ضيف)

  • مغلق Jack (مستخدم مسجل)

  • Peck Road Walker (ضيف)

التعليقات مغلقة لقضايا المؤرشفة.