说明
Resident requested the White delineators be fixed that were broken.
还问了...
问 Please select the issue:
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
问 Additional Information
答 没有给出答案
答 没有给出答案
5 评论s
Jersey City, NJ (官方验证)
已确认 Traffic – Jennifer C (官方验证)
RRC - Samantha (官方验证)
Engineering - Althea (官方验证)
关闭 Engineering - Althea (官方验证)