Description
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
3 Comments
Признана DC 311 (Registered User)
JTH (Registered User)
Закрыта DC 311 (Registered User)