Cross walk needs repainting تم حفظه في الأرشيف

343 Congress Street Boston, Massachusetts عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

ID قضية:

5025782

Submitted To:

Boston 311

فئة:

Traffic Signal

شاهدوا:

664 مرات

حي:

South Boston

ذكرت:

في

خدمة طلب ID:

101002685733

الوصف

Previous report in May:
Issue ID: 4480923
Service Request ID: 101002486320
Reported again in July:
Service Request ID: 101002561172
Service Request ID: 101002560235
You reported to me that there was no crosswalk repainted yet because "As part of the construction of the new building, the developer has agreed to install a new pedestrian ramp on both sides of the street. No crosswalk can be installed until the new pedestrian ramps are installed." People are living in the new building. Construction is done. It is almost 250 yards between the existing crosswalks in this area. People are constantly crossing where the crosswalk used to be. The City needs to demand that the developer finish the promised pedestrian ramps or make a temporary ramp and paint the crosswalk? Thank you.

سئل أيضا...
Q. Type of Signal
A. Pedestrian Signal
Q. Type of Problem
A. Other