Cambridge Drive will be resurfaced in the near future. All potholes and cracked pavement will be addressed at that time. Thank you for your patience and for using SeeClickFix!
I recall that Cambridge Drive was on the repavement schedule for 2017; then it disappeared. I noticed that repavement is scheduled for 2018, and I even received a flyer on my door maybe six weeks ago stating that repavement would commence within ten days.
5 评论s
已确认 Dunwoody Public Works (官方验证)
Dunwoody Resident (注册用户)
Public Works Inspector (注册用户)
关闭 Public Works Inspector (注册用户)
Dunwoody Resident (注册用户)