الوصف
Both sides of North Ave are in need of a sweep, which will probably require multiple passes to get a whole winter worth of debris out of the street. Especially in sections where potholes have been repeatedly filled with cold patch, the blown out patches and sections that have been ground down have all deposited enough material in the bike lanes that they're washboarded like a dirt road.
سئل أيضا...
Q. Is the sweeping needed on the street or sidewalk?
A. street
A. street
6 تعليقs
DPW Pine Customer Service (تم التحقق رسميا)
DPW Pine Customer Service (تم التحقق رسميا)
تم إقراره DPW Pine Customer Service (تم التحقق رسميا)
مغلق Lee Perry, Assistant Director, Maintenance Division (تم التحقق رسميا)
Swept on 3/29-30, 4/2-3-4/18.
That Guy (مستخدم مسجل)
cburch (مستخدم مسجل)