Horrible Railway Crossing تم حفظه في الأرشيف

9695-9751 108 Avenue Grande Prairie, Alberta عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

ID قضية:

3215449

Submitted To:

City of Grande Prairie

فئة:

Pothole

شاهدوا:

230 مرات

ذكرت:

في

الوصف

I bugged you all summer last year and nothing was done about this railway crossing. Now, I'm going to get a head start on this year. This is one decrepit crossing that's in need of a complete rebuild. It needs to be fixed first thing this season. People are traveling at 10k/hr over them and it is still too rough. It is now a public safety concern.

The intersection was repaved last year and has already crumbled away leaving large potholes that are difficult to dodge. This is unacceptable. The contractor that repaved it should be out repairing their pathetic work until they can redo it properly.

سئل أيضا...
Q. What size is the pothole?
A. Deep

5 تعليقs

التعليقات مغلقة لقضايا المؤرشفة.