Description
On the west side of North Ave, DPW & BED vehicles are currently parked in the street with the sidewalk blocked and excavated. There is no advance warning of a sidewalk closure and the crosswalk itself is blocked. For BHS students who were just released walking home northbound on the west side, they had no choice but to walk in the street around the section blocked by vehicles. If you're headed southbound in the bike lane, all the signage warning of the construction ahead is placed in the middle of the bike lane, instead of on the ample green space.
Both BED & DPW should manage this situation better, as there is currently zero consideration given to the safety of anybody walking or biking this section. It was a total junk show shortly after BHS release. In addition, the sidewalk and bike lane on the east side of the avenue is also blocked by a private paving contractor, with no signage or advanced warning.
9 Comments
Permitting and Inspections (Verified Official)
Acknowledged DPW Pine Customer Service (Verified Official)
DPW Pine Customer Service (Verified Official)
DPW Excavation Inspector (Verified Official)
Due to unfortunate circumstances and timing, City crews had to mobilize on North Ave for emergency repairs, creating a difficult situation for the pubic right of way due to the required limits of construction.
The private contractor on the opposite side of the street was repairing a private driveway, and was obstructing the bike lane, but allowing passage through via the sidewalk. Staff has informed contractor for the need of advanced warning or detours when working in the bike lane.
The North Ave ROW will be restored for public access as quickly as possible today.
That Guy (Registered User)
That Guy (Registered User)
Fix BTV (Registered User)
DPW Excavation Inspector (Verified Official)
Thank you for you comments and concerns, as we work to improve on this important piece of urban infrastructure upgrades.
Closed DPW Excavation Inspector (Verified Official)