Description
On all four corners of Congress and New York Avenue, the flexible delineators on the corners are wrecked. Some from trucks and people going to the liquor store, others from construction digging. Can you please replace them?
also asked...
Q. Please select the issue:
A. 2. Traffic: Street Signage (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
A. 2. Traffic: Street Signage (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
9 Comments
Jersey City, NJ (Verified Official)
Acknowledged AndrewV (Registered User)
Anthony Townsend (Registered User)
Engineering - Althea (Verified Official)
Anthony Townsend (Registered User)
Engineering - Althea (Verified Official)
That is not ungrateful, that is honest feedback. This is exactly what we need.
The team is right there with you! There was a meeting with the Director of Infrastructure and all of the division directors. This was a big subject. Why put something in that looks pretty for a hot second and then looks worse than the original street without the add-ons. They do help to deter drivers for awhile.
While we want to hard scape as many intersections we can per year, there is still a need for something to be done for the intersections that are years out. The Traffic Engineering director has ordered much more durable and lasting delineators for the next round. There will also need to be proper instruction as to how to install them, so there is no lift at the base.
The funds for hardscaping come from a different account, so the funds for the delineators is not taking away from the long term solutions.
We need to be a bad news organization, it is the only way the City gets better and the communities get what is needed.
Engineering - Althea (Verified Official)
Engineering - Althea (Verified Official)
Engineering - Althea (Verified Official)
The above duplicate dates back to 6/12/21.
Delineators are still on back order, but coming in soon.