Description
There has been two other posts about the scaffolding at this address. The city has acknowledged it and has yet to provide an update as to when the work and scaffolding will be coming down.
For a few weeks there was a portable bathroom on site and some work happening, and then it was removed and I haven't seen anyone since working on the building. The residents of this area deserve and answer about this. The scaffolding has been up for way too long, even if they continue to get permits. The city should provide an update to us and not leave this issue as opened since September when the complaint was filed. It blocks the sidewalk, has garbage all accumulated around the wood, drips water, and is an impact to the businesses that are located in this building.
18 Comments
City of Cambridge (Verified Official)
jk02140 (Registered User)
DRGA (Registered User)
Mary (Registered User)
jk02140 (Registered User)
Acknowledged City Hall - FG (Verified Official)
Closed City Hall - FG (Verified Official)
jk02140 (Registered User)
DRGA (Registered User)
City Hall - FG (Verified Official)
Reopened City Hall - FG (Verified Official)
Acknowledged City Hall - FG (Verified Official)
jk02140 (Registered User)
City Hall - FG (Verified Official)
City of Cambridge (Verified Official)
Public Works - KS (Community Relations) (Verified Official)
Closed Inspectional Services - JL (Inspections) (Verified Official)
The scaffolding was removed in February, soon after the completion of the façade work.
The scaffolding was originally installed after a piece of the façade fell onto the public way in March of 2021. Inspectional Services issued a citation to the building owner with an order to "undertake any and all actions necessary to correct" the violation of the MA State Building Code. The citation also contained an order to protect the pedestrian walkway.
Soon after the citation was issued, the building owner received Sidewalk Obstruction Permit and installed protective scaffolding. This obstruction permit remained active until February of 2024, when the scaffolding came down.
From March 2021 and February 2024, the façade repair and replacement work was stalled due to design changes, disputes between the contractor and design professional, and eventually, a change of contractor on the building permit. ISD and DPW maintained communication with the involved parties throughout this time period and also received complaints from members of the community.
At this point, the scaffolding is no longer in place, and the work is complete. A structural engineer issued a letter of conformance assuring that the façade was adequately repaired and is structurally sound. While we are not pleased with the amount of time it took, the scaffolding could not have been removed until this final letter of conformance was issued by a structural engineer.
For additional questions about this matter, please contact Inspectional Services at 617-349-6100.
jk02140 (Registered User)