Description
The traffic signal needs retiming! It looks to be pretimed to allow green time for 6th Ave even when there are no cars on 6the Ave S. It creates an artificial backup on MLK going south near the bridge especially with the construction that necks traffic down to one lane. During peak times the backup goes all the way north of 5th Ave S. MLK should receive more green time with the one lane of traffic due to the construction.
also asked...
Q. What is the issue?
A. Traffic Signal repair
A. Traffic Signal repair
3 Comments
Josh Shulman (Registered User)
Acknowledged St Pete Service Center 1 (Verified Official)
SPTO Traffic Ops 3 (Verified Official)